Network Alterations
We may need to make alterations to the electricity system. For example:
Building Work
Building work is proposed which requires cables, overhead lines, substations or meters to be moved.
Additional Equipment and Loads
Additional electrical equipment is to be connected which increases the load.
Additional Equipment and Disturbances
Additional electrical equipment is to be connected which could create a disturbance on the electricity system, ie connecting a motor or welder.
If there is any possibility that network alterations are required then please contact:-
East Midlands
Records Team
Western Power Distribution
Herald Way
Pegasus Business Park
Castle Donington
DE74 2TU
Tel 0845 072 7270
Fax 0115 876 7458
West Midlands
Records Team
Western Power Distribution
Toll End Road
Tipton
DY4 0HH
Tel 0845 072 7270
Fax 0115 876 7458
South Wales
Records Team
Western Power Distribution
Phoenix Way
Llansamlet
Swansea
SA7 9HW
Tel 0845 6013341
Fax 01792 784510
Email wpdnewsupplieswales@westernpower.co.uk
South West
Records Team
Western Power Distribution
Lostwithiel Road
Bodmin
PL31 1DE
Tel 0845 601 2989
Fax 01208 892292
email wpdnewsupplies@westernpower.co.uk
Please see our Connections page for further information.